{"id":2289,"date":"2022-09-12T14:00:21","date_gmt":"2022-09-12T12:00:21","guid":{"rendered":"https:\/\/blog.rwth-aachen.de\/akustik\/?p=2289"},"modified":"2022-09-12T14:18:24","modified_gmt":"2022-09-12T12:18:24","slug":"junge-dega-workshop-2022-in-stuttgart","status":"publish","type":"post","link":"https:\/\/blog.rwth-aachen.de\/akustik\/junge-dega-workshop-2022-in-stuttgart\/","title":{"rendered":"junge DEGA Workshop 2022 in Stuttgart"},"content":{"rendered":"<p>From 2<sup>nd<\/sup> to 4<sup>th<\/sup> September 2022, after a three-years break due to the Covid-19 pandemic, the \u201cjunge DEGA Herbstworkshop\u201d took place in Stuttgart, like the DAGA conference earlier this year. <a href=\"https:\/\/www.dega-akustik.de\/junge-dega\"><em>Junge DEGA<\/em><\/a> is a sub-group of the <a href=\"https:\/\/www.dega-akustik.de\/\">German Acoustical Society<\/a> with the mission to connect students, PhDs and young professionals in the domain of acoustics. It organizes special sessions and panel discussions during the <a href=\"http:\/\/www.daga-tagung.de\/\">Annual German Conference on Acoustics (DAGA)<\/a>, providing information on research funding opportunities and job entry. Furthermore, <em>junge DEGA<\/em> offers a <a href=\"https:\/\/www.dega-akustik.de\/junge-dega\/mentoring-programm\">mentoring program<\/a> with active participation from industry and academia.<\/p>\n<p>Two PhD students of the Institute for Hearing Technology and Acoustics, <a href=\"https:\/\/www.akustik.rwth-aachen.de\/cms\/Institut-fuer-Hoertechnik-und-Akustik\/Das-Institut\/Team\/TA-Team\/~jfqdq\/Simon-Kersten\/\">Simon Kersten<\/a> and <a href=\"https:\/\/www.akustik.rwth-aachen.de\/cms\/Institut-fuer-Hoertechnik-und-Akustik\/Das-Institut\/Team\/TA-Team\/~myjqa\/Jonas-Heck\/\">Jonas Heck<\/a>, as well as Nils Rummler, recently graduated bachelor student, participated in this year\u2019s workshop. The program started with visits at the <a href=\"https:\/\/www.ibp.fraunhofer.de\/\">Fraunhofer Institute for Building Physics IBP<\/a> and the <a href=\"https:\/\/www.hft-stuttgart.de\/bauphysik\/einrichtungen\/zentrum-fuer-bauphysik-zfb\">Center for Building Physics (ZfB, Hochschule f\u00fcr Technik Stuttgart)<\/a>. Furthermore, it consisted of short presentations given by the participants, a plenary meeting of the <em>junge DEGA<\/em> group to plan the following year\u2019s activities and a guided visit of the <a href=\"https:\/\/www.bahnprojekt-stuttgart-ulm.de\/aktuell\/\">new main station construction site (known as Stuttgart 21)<\/a> with a focus on noise and vibration control. The weekend was concluded with a hands-on workshop on building a loudspeaker from residual materials and competing for the highest sound pressure level.<\/p>\n<p>Pictures from the workshop can be found in the gallery below.<\/p>\n<p>&nbsp;<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-2289 gallery-columns-3 gallery-size-large'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/blog.rwth-aachen.de\/akustik\/junge-dega-workshop-2022-in-stuttgart\/alle\/'><img loading=\"lazy\" decoding=\"async\" width=\"372\" height=\"265\" src=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/alle.png\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-2293\" srcset=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/alle.png 372w, https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/alle-300x214.png 300w\" sizes=\"auto, (max-width: 372px) 100vw, 372px\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-2293'>\n\t\t\t\tParticipants of the junge DEGA Herbstworkshop 2022\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blog.rwth-aachen.de\/akustik\/junge-dega-workshop-2022-in-stuttgart\/gr1\/'><img loading=\"lazy\" decoding=\"async\" width=\"187\" height=\"279\" src=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/gr1.png\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-2294\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-2294'>\n\t\t\t\tLoudspeaker competition\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/blog.rwth-aachen.de\/akustik\/junge-dega-workshop-2022-in-stuttgart\/gr2\/'><img loading=\"lazy\" decoding=\"async\" width=\"187\" height=\"280\" src=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/gr2.png\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-2295\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-2295'>\n\t\t\t\tLoudspeaker competition\n\t\t\t\t<\/dd><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/blog.rwth-aachen.de\/akustik\/junge-dega-workshop-2022-in-stuttgart\/gr3\/'><img loading=\"lazy\" decoding=\"async\" width=\"423\" height=\"279\" src=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/gr3.png\" class=\"attachment-large size-large\" alt=\"Loudspeaker competition\" aria-describedby=\"gallery-1-2296\" srcset=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/gr3.png 423w, https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/gr3-300x198.png 300w\" sizes=\"auto, (max-width: 423px) 100vw, 423px\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-2296'>\n\t\t\t\tLoudspeaker competition\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/blog.rwth-aachen.de\/akustik\/junge-dega-workshop-2022-in-stuttgart\/20220903_170610\/'><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/20220903_170610-1024x576.jpg\" class=\"attachment-large size-large\" alt=\"\" aria-describedby=\"gallery-1-2300\" srcset=\"https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/20220903_170610-1024x576.jpg 1024w, https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/20220903_170610-scaled-e1662984764964-300x169.jpg 300w, https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/20220903_170610-768x432.jpg 768w, https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/20220903_170610-1536x864.jpg 1536w, https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/20220903_170610-2048x1152.jpg 2048w, https:\/\/blog.rwth-aachen.de\/akustik\/files\/2022\/09\/20220903_170610-scaled-e1662984764964.jpg 512w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-2300'>\n\t\t\t\tVisit of the Stuttgart21 construction site\n\t\t\t\t<\/dd><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>From 2nd to 4th September 2022, after a three-years break due to the Covid-19 pandemic, the \u201cjunge DEGA Herbstworkshop\u201d took place in Stuttgart, like the DAGA conference earlier this year. [&hellip;]<\/p>\n","protected":false},"author":3556,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"c2c_always_allow_admin_comments":false,"footnotes":""},"categories":[15,55,1],"tags":[],"class_list":["post-2289","post","type-post","status-publish","format-standard","hentry","category-conferences","category-events","category-ihta"],"_links":{"self":[{"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/posts\/2289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/users\/3556"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/comments?post=2289"}],"version-history":[{"count":6,"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/posts\/2289\/revisions"}],"predecessor-version":[{"id":2303,"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/posts\/2289\/revisions\/2303"}],"wp:attachment":[{"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/media?parent=2289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/categories?post=2289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.rwth-aachen.de\/akustik\/wp-json\/wp\/v2\/tags?post=2289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}